spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
spacer
open spacer spacer
spacer SITE NAVIGATION spacer
spacer
spacer spacer spacer
Sections
spacer
Personnel
spacer
Project Flow Chart
spacer
General Project Notes & Standards List
spacer
Calculation of Quantities
spacer
Specifications and Provisions
spacer
Standard Drawings Library spacer
2007 Bid Averages
spacer
Archive of Bid Average
spacer
2002 Trns*port Pay Item List (pdf)
spacer
2002 Trns*port Pay Item List (xls)
spacer
2006 Trns*port Pay Item List (pdf)
spacer
2006 Trns*port Pay Item List (xls)
spacer
Review Lists for Checking Plans
spacer
Committees & Minutes
spacer
Federalize State Projects
spacer
spacer spacer
spacer
spacer
spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  Contract Office  - Section Breakdown
spacer
spacer spacer

The Plans and Standards Section consists of the Plan Review Engineers and the Standard Drawing Engineers. The Plan Review Engineers receive plans from the designers and are reviewed for constructability to ensure that they comply with NCDOT Standard Standards. The Standard Drawing Engineers maintain the Roadway Standard Drawings and prepare special detail designs and drawings to cover unique situations not covered by the Roadway Standard Drawings. When plan checking is complete, the plans are sent to the Proposal and Contracts Section.

The Proposals and Contracts Section includes the Provisions Engineers, Specifications Engineer and Contract Time Engineers. The Provisions Engineers review the plans for compliance with the NCDOT Standard Specifications for Roads and Structures; incorporating provisions for special items and construction methods not covered by the Specifications Book into the proposal. They are responsible for the contents of the proposal for each project let. The Specification Engineer is responsible for revising and publishing the Specifications Book. The Contract Time Engineers are responsible for setting contract times on all projects. After the proposal is complete, the plans and proposal are sent to Engineer Estimates.

The Estimating Section includes Preliminary Estimates Engineers, the Engineer's Estimate Engineers and support for bid lettings. The Estimating Engineers prepare the official engineer's estimate for each contract, based on the plans, proposal and unique conditions to the specific project. The Preliminary Estimates Engineers prepare estimate for the TIP book. After the Engineers Estimates is complete, the Proposals and Contracts Unit reviews again and has the final proposal completed. The proposal, the plans, and contract go to the Records and Documents Unit.

The personnel in Records and Documents prepare bid packages for the Project Letting, opened the third Tuesday of every month. The Record section archives, maintains, and provides information pertaining to projects let by the NCDOT. Internal and external plan distributions, both pre-let and let, mail and supply services for the units located at the Century Center complex are processed by this section. Additionally this section processes orders received from Contractors wishing to purchase plans and proposals. All documents pertaining to lettings such as: addendums, item C, Bid Tabs, Invitation to Bid, are also distributed by this group.

spacer spacer
spacer
 
North Carolina DOT Logo   The North Carolina
Department of Transportation