GENERAL CONSTRUCTION PROJECTS


GENERAL PROVISIONS

Revised
SP1G01 PROJECT SPECIAL PROVISIONS - General  (Heading Only)  
SP1G03 NOTICE TO BIDDERS  (Cluster Projects Only) A - (2 Projects)    B - (3 Projects)  
SP1G04 CONTRACT TIME AND LIQUIDATED DAMAGES
Date of availability ______________________
Completion date _________________________
Liquidated damages $________________
 
SP1G05 CONTRACT TIME AND LIQUIDATED DAMAGES - (Floating Dates of Availability)
Date not before ________________or later than____________________
Completion date _________________________
Liquidated damages $________________
A - (Permits)    B - (No Permits)
 
SP1G07 CONTRACT TIME AND LIQUIDATED DAMAGES - Permits & ICT for Reforestation
Date of availability ______________________
Completion date _________________________
Liquidated damages are already set for $200 dollars in the provision
A       B - (Floating dates of availability)
 
SP1G10 CONTRACT TIME AND LIQUIDATED DAMAGES -NO permits
Date of availability ______________________
Completion date _________________________
Liquidated damages $________________
 
SP1G13 INTERMEDIATE CONTRACT TIME #1 AND LIQUIDATED DAMAGES
Date of availability ___________________
All work, except Reforestation completed by ______________________
Liquidated damages ______________________
A       B - (Floating dates of availability)
 
SP1G14 INTERMEDIATE CONTRACT TIMES   (New Provision - "B")  
SP1G22 DELAY IN RIGHT OF ENTRY  
SP1G28 MAJOR CONTRACT ITEMS  
SP1G31 NO MAJOR CONTRACT ITEMS  
SP1G34 NO SPECIALITY ITEMS  
SP1G37 SPECIALITY ITEMS  
SP1G40 SPECIAL REQUIREMENTS FOR WORK IN NATIONAL FOREST  
SP1G43 FUEL PRICE ADJUSTMENT   Jan 09
SP1G49 PARTNERING  
SP1G58 SCHEDULE OF ESTIMATED COMPLETION PROGRESS  
SP1G59 REVISION TO FHWA 1273   Feb 09
SP1G61 DISADVANTAGED BUSINESS ENTERPRISES  
SP1G67 MINORITY AND WOMEN BUSINESSES  
SP1G70 PROGRESS SCHEDULE - All Projects  
SP1G75 MENTOR-PROTÉGÉ PROGRAM   (When requested by the Proposals and Contract Engineer)  
SP1G80 LIABILITY INSURANCE (ALL RALEIGH-LET AND POC'S)   Nov 08
SP1G85 CERTIFICATION FOR FEDERAL-AID CONTRACTS (F.A. Only)  
SP1G88 CONTRACTOR'S LICENSES REQUIREMENTS  
SP1G91 SUBMISSION OF BIDS - Alternates (Use with SP3R36)  
SP1G100 U.S. DEPARTMENT OF TRANSPORTATION HOTLINE (F.A. Only)  
SP1G103 SUBMISSION OF RECORDS - FEDERAL-AID PROJECTS (BRZ Projects only)  
SP1G112 SUBSURFACE INFORMATION (Is not available)  
SP1G115 SUBSURFACE INFORMATION (Roadway only)  
SP1G118 SUBSURFACE INFORMATION (Structures only)  
SP1G119 SUBSURFACE INFORMATION (Roadway & Structures)  
SP1G121 PAYMENTS FOR MATERIALS - PORTABLE CONCRETE BARRIER  
SP1G124 PAYMENTS FOR MATERIALS - REMOVABLE PAVEMENT MARKING MATERIAL  
SP1G125 MAINTENANCE OF THE PROJECT - All Projects  
SP1G133 COOPERATION BETWEEN CONTRACTORS  
SP1G140 CONTRACTOR CLAIM SUBMITTAL FORM  
SP1G142 BID DOCUMENTATION  
SP1G145 TWELVE MONTH GUARANTEE - TIP Projects ONLY  
SP1G150 OUTSOURCING OUTSIDE THE USA  
SP1G151 ACT OF GOD  
SP1G180 EROSION & SEDIMENT CONTROL STORMWATER CERTIFICATION (without LDs)  
SP1G181 PROCEDURE FOR MONITORING BORROW PIT DISCHARGE  


ROADWAY PROVISIONS

SP1R01 PROJECT SPECIAL PROVISONS - Roadway (Heading only)  
SP2R01 CLEARING AND GRUBBING - Method "II"  
SP2R02 CLEARING AND GRUBBING - Method "III"  
SP2R05 BURNING RESTRICTIONS  
SP2R10 DEMOLITION OF BUILDINGS AND APPURTENANCES  
SP2R15 BUILDING AND UNDERGROUND STORAGE TANK REMOVAL  
SP2R18 EMBANKMENTS (Use with Drilled Piers, Piles, Signal Poles, On Signs, HM Lights)  
SP2R30 TEMPORARY DETOURS (Onsite detours)  
SP2R31 TEMPORARY DETOURS (Onsite detours with lump sum grading)  
SP2R35 SHALLOW UNDERCUT A  - (With undercut 225)    B  - (With undercut 226)  
SP2R40 FALSE SUMPS (Need plan detail)  
SP2R45 SHOULDER AND FILL SLOPE MATERIAL
A -(With lump sum grading)  B -(With lump sum grading and borrow excavation) C -(No lump sum grading)
 
SP2R57 BORROW EXCAVATION (TRUCK MEASURMENT)  
SP2R58 BORROW EXCAVATION (IN PLACE OR TRUCK MEASURMENT)  
SP2R65 RESTRICTIONS ON CONSTRUCTION OF EMBANKMENTS  
SP2R70 COAL FLY ASH IN EMBANKMENTS  
SP2R75 EMBANKMENT MONITORING  
SP3R01 REINFORCED CONCRETE TAPERED INLET  
SP3R05 SADDLE BRANCH CONNECTOR  
SP3R10 C.S.SLOTTED DRAIN  
SP3R15 15" R. C. PIPE TEE DROP INLET  
SP3R20 SEEPS  
SP3R30 FLOWABLE FILL  
SP3R33 PIPE TESTING  
SP3R36 PIPE ALTERNATES (Use with SP1G91)  
SP4R01A REINFORCED BRIDGE APPROACH FILLS  
SP4R01B REINFORCED BRIDGE APPROACH FILLS  
SP4R02 BRIDGE APPROACH FILL - SUB REGIONAL TIER  
SP5R03 AGGREGATE BASE COURSE  
SP5R05 PREPARATION OF SUBGRADE AND BASE (Use with SP6R45)  
SP5R15 AGGREGATE FOR SOIL-CEMENT BASE  
SP6R01 ASPHALT PAVEMENTS SUPERPAVE  
SP6R06 ASPHALT PAVER - FIXED STRING LINE  
SP6R07 ASPHALT PAVER - FIXED AND MOBILE STRING LINE  
SP6R15 ASPHALT BINDER CONTENT OF ASPHALT PLANT MIXES  
SP6R20 ASPHALT PLANT MIXTURES  
SP6R25 PRICE ADJUSTMENT - ASPHALT BINDER FOR PLANT MIX  
SP6R45 FINAL SURFACE TESTING - ASPHALT PAVEMENTS RIDEABILITY (use with SP5R05)  
SP6R50 SEALING EXISTING PAVEMENT CRACKS  
SP7R05 TYING PROPOSED CONCRETE PVMT. TO EXISTING CONCRETE PVMT.  
SP7R10 TYING PROPOSED CONCRETE PVMT. TO PROPOSED ASPHALT PVMT.  
SP7R12 TYING PROPOSED ASPHALT PVMT. TO EXISTING CONCRETE PVMT.  
SP7R15 BEGINNING AND ENDING OF CONCRETE PAVEMENT  
SP7R20 CONCRETE PAVEMENT AND SHOULDERS  
SP8R01 MASONRY DRAINAGE STRUCTURES (Linear Foot)  
SP8R02 SHPO DOCUMENTATION FOR BORROW/WASTE SITES  
SP8R03 CONCRETE TRANSITIONAL SECTIONS FOR CATCH BASIN AND DROP INLETS   Jan 09
SP8R10 MODIFIED CONCRETE FLUME WITH CONCRETE OUTLET  
SP8R15 MODIFIED CONCRETE FLUME WITH FUNNEL OUTLET  
SP8R20 SLUICE GATE  
SP8R25 END WALLS  
SP8R31 SANDBAG HEADWALL  
SP8R35 GRATES AND FRAME (DRIVEWAY DROP INLET)  
SP8R40 2'-6" CONCRETE CURB AND GUTTER (SPECIAL)  
SP8R45 CONVERTING EXISTING DROP INLET TO SHOULDER DROP INLET  
SP8R50 CONVERT EXISTING __________ TO _________  
SP8R55 REMOVE AND STOCKPILE EXISTING GUARDRAIL  
SP8R60 GUARDRAIL ANCHOR UNITS, TYPE M350  
SP8R65 GUARDRAIL ANCHOR UNITS, TYPE 350  
SP8R69 CABLE GUIDERAIL (Use with additional guiderail posts)  
SP8R75 IMPACT ATTENUATOR UNITS, TYPE 350  
SP8R85 TEMPORARY WOVEN WIRE FENCE  
SP8R86 PROJECTS WITH FENCING  
SP8R100 CHAIN LINK FENCING WITH BARBED WIRE ON EXTENSION ARMS  
SP8R105 PREFORMED SCOUR HOLE WITH LEVEL SPREADER APRON  
SP8R125 RETROFITTING WHEELCHAIR RAMPS WITH DETECTABLE WARNINGS RAISED TRUNCATED DOMES  
SP9R01 STREET SIGNS AND ROUTE MARKERS (Existing)  
SP9R02 STEEL U-CHANNEL POSTS  
SP9R03 SHIPPING SIGNS  
SP10R01 HIGH STRENGTH CONCRETE FOR DRIVEWAYS  
SP10R02 GALVANIZED HIGH STRENGTH BOLTS, NUTS, AND WASHERS   Feb 09
SP10R05 AGGREGATE PRODUCTION  
SP10R10 CONCRETE BRICK AND BLOCK PRODUCTION  
SP10R15 AGGREGATE FOR ASPHALT PAVEMENTS AND RESURFACING TREATMENTS (ULTRA-THIN)  
SP10R16 PORTLAND CEMENT CONCRETE (Alkali-Silica Reaction)  
SP10R35 GLASS BEADS (Use on projects w/Pavement Markings)  
SP10R40 ENGINEERING FABRIC TABLE 1056-1 (Projects w/Fabric)  
SP10R42 PRECAST DRAINAGE STRUCTURES-MACRO-SYNTHETIC FIBERS   Nov 08
SP10R45 PAINT SAMPLING AND TESTING  
SP10R50 TEMPORARY PORTABLE CONCRETE BARRIER  
SP11R02 TEMPORARY SHORING  
SP11R11 CHANGEABLE MESSAGE SIGNS  
SP12R01 PAVEMENT MARKING LINES MEASUREMENT & PAYMENT  
SP14R01 COORDINATION OF LIGHTING WORK (Existing & New)  
SP15R01 EXCAVATION, TRENCHING, PIPE LAYING, AND BACKFILLING FOR UTILITIES   Feb 09
SP16R01 PERMANENT SEEDING AND MULCHING (incentive payment)