Close Menu

NCDOT Continues Lighting Work on I-77 in Mecklenburg County Tonight, Sunday Night

CHARLOTTE -The N.C. Department of Transportation will continue lighting improvements on I-77 near downtown Charlotte beginning at 9 p.m. tonight, weather permitting. The work is part of a $473,000 contract awarded to Brooks, Berry and Haynie of Mableton, Ga. to improve lighting on I-77, I-277, and a section of I-85 in Cabarrus County.

At 9 p.m., the contractor will close the right lane on I-77 South under the John Belk Freeway (Exit 9), as well as two ramps in the area:

  • The exit ramp from I-277 Inner to I-77 South; and
  • The entrance ramp from West Trade Street to I-77 South.

Lane and ramp closures are scheduled to end by 6 a.m. Friday, June 22.

The contractor will resume work on at 9 p.m. Sunday, June 24, closing the right lane on I-77 South between Trade Street (Exit 10) and the John Belk Freeway, along with two ramps:

  • The exit ramp from I-77 South to Morehead Street; and
  • The entrance ramp from Trade Street to I-77 South.

Lane and ramp closures will be removed by 6 a.m. Monday, June 25.

For real-time travel information at any time, call 511 or follow NCDOT on Twitter at www.ncdot.gov/travel/twitter. Another option is NCDOT Mobile, a phone-friendly version of the NCDOT website. To access it, type "m.ncdot.gov" into the browser of your smartphone. Then, bookmark it to save for future reference. NCDOT Mobile is compatible with the iPhone, Android and some newer Blackberry phones.

For more information, please call the resident engineer at (704) 847-5006.

***NCDOT***

2/15/2018 5:25 PM

Back to top