Close Menu

NCDOT Will Start Bridge Replacement Project on N.C. 49 in Stanly County Next Week

CHARLOTTE The N.C. Department of Transportation is preparing to replace the bridge on N.C. 49 over Curl Tail Creek near Richfield on Monday, August 12, weather permitting.

Dellinger Inc. was awarded the $2.7 million contract to replace the existing bridge with a longer, wider structure about 70 feet north of its current location. The bridge was built in 1955 and is now considered structurally deficient. The bridge is safe, but it needs to be replaced to meet current and future traffic demands. A longer, wider structure will enhance safety and traffic mobility.

While the project is underway, traffic will be maintained on N.C. 49. There will not be an offsite detour. The project is scheduled to be completed by April 30, 2015.

NCDOT reminds motorists to watch signs for construction information, stay alert and obey the posted speed limit.

For real-time travel information at any time, call 511, visit www.ncdot.gov/travel or follow NCDOT on Twitter at www.ncdot.gov/travel/twitter. Another option is NCDOT Mobile, a phone-friendly version of the NCDOT website. To access it, type "m.ncdot.gov" into the browser of your smartphone. Then, bookmark it to save for future reference. NCDOT Mobile is compatible with the iPhone, Android and some newer Blackberry phones.

For more information, please contact the resident engineer at (980) 523-0080.

***NCDOT***

2/19/2018 7:50 AM

Back to top