Close Menu

NCDOT will shift traffic and close ramps at I-85 and N.C. 73 in Cabarrus County this weekend

Closures are part of $125.2 million I-85 widening project

CHARLOTTE -The N.C. Department of Transportation will be working at the I-85 interchange with N.C. 73 (Exit 55) at 1 a.m. Saturday, May 4, weather permitting. Crews will be preparing to shift traffic to the new N.C. 73 bridge, part of the 6.8-mile I-85 widening project, improving I-85 from four to eight lanes from south of Bruton Smith Boulevard (Exit 49) to north of N.C. 73.

Motorists exiting I-85 North and South at N.C. 73 will only be able to go up and over the ramps between 1 a.m. and 9 a.m. Saturday while crews remove overhangs at the existing bridge.

Crews will resume work at 9 p.m. Saturday night, closing the exit ramp from I-85 South to N.C. 73, and the entrance ramp from N.C. 73 to I-85 North to safely shift traffic to the new N.C. 73 bridge. The contractor will also restripe the roadway, remove pavement markings, and reset barrier wall.

Motorists are encouraged to use George Liles Parkway to access I-85 North or South during these closures. The contractor will also post warning signs to alert traffic.

NCDOT reminds motorists to watch signs for construction information, stay alert and obey the posted speed limit.

For real-time travel information at any time, call 511, visit www.ncdot.gov/travel or follow NCDOT on Twitter at www.ncdot.gov/travel/twitter. Another option is NCDOT Mobile, a phone-friendly version of the NCDOT website. To access it, type "m.ncdot.gov" into the browser of your smartphone. Then, bookmark it to save for future reference. NCDOT Mobile is compatible with the iPhone, Android and some newer Blackberry phones.

For more information, please contact the resident engineer at (704) 983-4171.

***NCDOT***

2/19/2018 7:50 AM

Back to top