N.C. 12 Pea Island Interim Bridge

Project Overview

The interim Pea Island bridge replaces a temporary metal bridge that the N.C. Department of Transportation built on N.C. 12 to restore traffic following a breach caused by Hurricane Irene in 2011.

The project – along with a bridge in Rodanthe that would carry N.C. 12 over the Pamlico Sound – is considered part of Phase II of the Bonner Bridge replacement project.