U.S. 70 Improvements in Durham and Raleigh

Project Overview and Purpose

Planning is underway to convert approximately 5 miles of U.S. 70 – from Lynn Road in Durham to west of T.W. Alexander Drive in Raleigh – to a freeway.

Doing so would improve the connection between the East End Connector (currently under construction) in Durham and I-540 in Wake County.

The project would also improve traffic congestion, travel time and safety along U.S. 70.

Access to U.S. 70 would be provided at interchange locations. The intersection of U.S. 70 with South Miami Boulevard/Mineral Springs Road/Sherron Road would be converted to an interchange. The freeway classification means that there would no longer be driveways or intersections along this portion of U.S. 70 and new frontage roads, service roads or other local roadway connections would be evaluated.

The proposed project is being developed in conjunction with additional proposed improvements to U.S. 70 between Brier Creek Parkway and T.W. Alexander Drive in Raleigh.

Contact

Mark Pierce, P.E.

Consultant Project Manager
RK&K

900 Ridgefield Drive, Suite 350
Raleigh, NC 27609

Elmo Vance Jr.

Project Manager
Project Management

1595 Mail Service Center
Raleigh, NC 27699-1595

7/10/2018 10:18 AM

Back to top