skip to main
Close Menu

Closures Ahead for Final Demolition Work of 4th Street Bridge on Business 40 (U.S. 421 Salem Parkway) Project

WINSTON-SALEM — N.C. Department of Transportation contractors will close a portion of Business 40 for the completion of the 4th Street bridge demolition that started last month in Winston-Salem.

Starting at 9 p.m. on Monday, April 23, the inside lane of Business 40 will close in both directions between Cloverdale Avenue and Peters Creek Parkway. Then, from 10 p.m. to 6 a.m., all traffic will be detoured off Business 40. The roadway will reopen to traffic by 6 a.m. on Tuesday, April 24; weather permitting.

"The closure is needed for the protection of workers and drivers as the demolition requires crews to work inches away from the roadway," said NCDOT Division Engineer Pat Ivey.

Travelers can detour using Cloverdale, 1st Street and Peters Creek Parkway in each direction.

NCDOT reminds motorists to watch signs for construction information, stay alert, slow down in the work zone and obey the posted speed limit.

For real-time travel information, visit DriveNC.gov or follow NCDOT on Twitter using the hashtag #Biz40NC.

***NCDOT***

10/3/2018 11:57 AM