Western Loop (U-2524D)

Project Information Left Table
County:Guilford
Status:Complete
STIP Number:U-2524D
Project Information Right Table
Estimated Cost:$67.9 million
Start Date:October 2016
Completion Date:December 2019

​​​​​Project Overview

The N.C. Department of Transportation constructed a six-lane freeway from U.S. 220 (Battleground Avenue) to Lawndale Drive in northwest Greensboro. As part of this project, NCDOT completed the U.S. 220 (Battleground Avenue) interchange and built a new interchange connecting the Greensboro Loop to Lawndale Drive.

News and Updates

Construction began in October 2016. The section opened to traffic on Dec. 30, 2019.

Project Highlights

  • Build a six-lane freeway from U.S. 220 (Battleground Avenue) to Lawndale Drive.
  • Complete the Greensboro Loop/U.S. 220 (Battleground Avenue) interchange.
  • Build a bridge on Lake Brandt Road Extension over the Greensboro Loop.
  • Build a pedestrian bridge over the Greensboro Loop to tie the proposed bikeway along Old Battleground Avenue to the existing 10-foot path.
  • Extend Lake Brandt Road to Cotswold Avenue.
  • Realign Cotswold Terrace at its intersection with Cotswold Avenue.
  • Construct a cul-de-sac at the end of Old Battleground Road south of the Greensboro Loop.
  • End Old Battleground Road at Lake Brandt Road north of the Greensboro Loop.
  • Build an interchange at the intersection of the Greensboro Loop and Lawndale Drive.

Upcoming Public Meetings

There are no upcoming public meetings for this project.