Page ContentSome information on this page represents an archive of past NCDOT activity. Archived content may not be ADA accessible if added before April 26, 2027. If you require this in a different format, please send a message. I-95 Widening from Long Branch Road to I-40 (Exit 81) in Johnston County - Overall MapPDF • 3MB • October 15, 2018I-95 Widening from Long Branch Road to I-40 (Exit 81) in Johnston County - Map 7PDF • 4MB • October 15, 2018I-95 Widening from Long Branch Road to I-40 (Exit 81) in Johnston County - Map 8PDF • 3MB • October 15, 2018I-95 Widening from Long Branch Road to I-40 (Exit 81) in Johnston County - Map 9PDF • 4MB • October 15, 2018I-95 Widening from Long Branch Road to I-40 (Exit 81) in Johnston County - Map 10PDF • 2MB • October 15, 2018I-95 Widening from Long Branch Road to I-40 (Exit 81) in Johnston County - Map 11PDF • 4MB • October 15, 2018I-95 Widening from Long Branch Road to I-40 (Exit 81) in Johnston County - Map 12PDF • 2MB • October 15, 2018I-95 Widening from Long Branch Road to I-40 (Exit 81) in Johnston County - Map 13PDF • 3MB • October 15, 2018I-95 Widening from Long Branch Road to I-40 (Exit 81) in Johnston County - Map 14PDF • 2MB • October 15, 2018I-95 Widening from Long Branch Road to I-40 (Exit 81) in Johnston County - Map 15The final design includes retaining, but improving, the existing bridge and having a traffic signal at the N.C. 50 and I-95 southbound ramps intersection, rather than a roundabout as shown on the preliminary design maps from 2018.PDF • 4MB • October 15, 2018I-95 Widening from Long Branch Road to I-40 (Exit 81) in Johnston County - Map 16PDF • 3MB • October 15, 2018 6/16/2026 9:01 AM