Mid-Currituck Bridge

Project Overview

The only highway crossing of the Currituck Sound along the North Carolina coast is the Wright Memorial Bridge on U.S. 158 at the southern end of Currituck County into Dare County.

The single crossing can mean increased congestion – especially during the summer – on U.S. 158 as well as N.C. 12, resulting in increased travel times between the mainland and the Outer Banks. Hurricane evacuation clearance times for those using U.S. 158 and N.C. 168 also far exceed the state-designated standard of 18 hours.

The Mid-Currituck Bridge project would create a second crossing of the sound – north of the Wright Memorial Bridge – to help alleviate congestion and improve the flow of evacuation traffic in the event of a hurricane or severe storm.

It would also provide easier access between the Outer Banks and Virginia, as well as other communities in northeastern North Carolina.

The 7-mile toll project includes a two-lane bridge that spans the Currituck Sound and connects the Currituck County mainland to the Outer Banks. It also includes a second two-lane bridge that spans Maple Swamp on the Currituck County mainland, connecting Aydlett to U.S. 158.

The project has an overall estimated cost of $440 million. A portion of the funding is expected to come from bonds that will be paid back with toll revenue. The remainder of the funding is expected to come from a combination of state and federal transportation tax revenues. After taking into account funding from toll revenue, the project has an estimated cost of $173 million to NCDOT.

There is not an estimated toll rate at this time. ​

Contact

Toll-Free Project Hotline

(800) 961-5465

Rodger Rochelle

Chief Engineer, Innovative Delivery
N.C. Turnpike Authority

1578 Mail Service Center
Raleigh, NC 27699-1578

11/21/2018 12:14 PM

Back to top