N.C. 147 Extension

​​Preliminary engineering activities for this project have been temporarily suspended. Read more​.​​​​​​​​​​​​​​

Project Overview

Planning and development are underway on a proposed project in Wake County to build a median-divided four-lane road that would extend N.C. 147 south of I-540 in Morrisville.  

The proposed work would improve traffic flow and provide a connection between Davis Drive, the Research Triangle Park, I-540 and Morrisville.  The project has the potential to reduce travel times and distance in the area. 

By providing an important connection in Morrisville, the proposed project would also reduce the amount of traffic on the existing roadways and improve overall roadway efficiency and volume.

Project Funding

This project is listed as Project U-5966 in the N.C. Department of Transportation's State Transportation Improvement Program and is funded for $63.53 million.

​Estimated Cost*
​Project development and design​$750,000
​Property acquisition​$5,000,000
Utilities
​$100,000
​​Construction costs
​$57,689,000
​Total cost ​$63,539,000

*Estimated costs subject to change

Contact

Brian Blackwell, P.E.

Consultant
HNTB North Carolina, PC

343 East Six Forks Road
Raleigh, NC 27609

Brett Lackey

Project Manager
NCDOT Division 5

1616 East Millbrook Road, Suite 160
Raleigh, NC 27609-4968

10/11/2019 9:04 AM