Page ContentSome information on this page represents an archive of past NCDOT activity. Archived content may not be ADA accessible if added before April 26, 2027. If you require this in a different format, please send a message. Expand AllCollapse AllProject Maps U.S. 64 Corridor Phase 1 US 64-NC 49 Study Area (Oct. 24, 2005) Project DocumentsU.S. 64 Corridor Phase 1 US 64-NC 49 Study Area (Oct. 24, 2005) US 64-NC 49 Corridor Study - No Build Alternative (Sept. 16, 2011) US 64-NC 49 - Expressway Alternative Typical Section and Access Plan (Sept. 16, 2011) US 64-NC 49 - Freeway Alternative Typical Section and Access Plan (Sept. 16, 2011) US 64-NC 49 Corridor Study E+C (Existing Plus Committed) Alternative (Sept. 16, 2011) U.S. 64 Corridor Phase 1 No-Build Alternative (July 28, 2009) U.S. 64 Corridor Phase 1 E+C (Existing Plus Committed) Alternative (July 28, 2009)U.S. 64 Corridor Phase 1 E+C Enhanced Alternative (July 28, 2009) U.S. 64 Corridor Phase 1 Expressway Alternative (July 29, 2009)U.S. 64 Corridor Phase 1 Freeway Alternative (July 29. 2009)U.S. 64 Corridor Phase 1 Implementing the Vision (July 28, 2009)U.S. 64 Corridor Phase 1 Problem Statement (July 28, 2009)U.S. 64 Corridor Phase 1 Problem Statement (Nov. 4, 2005) U.S. 64 Corridor Phase 1 Postcard Survey Report (Sept. 16, 2011) U.S. 64 Corridor Phase 1 Roadside Survey Report (Sept. 16, 2011) 6/17/2026 12:17 PM