Project Highlights

Proposed Future Projects

  • Build an interchange connecting the Greensboro Loop to the proposed Fleming Road Extension that will also connect to Lewistown Road (TIP Project U-2524F, which is currently unfunded).
  • Build an interchange connecting the Greensboro Loop to the proposed Cone Boulevard Extension (TIP Project U-2525D, which is currently unfunded). For more information, read the Cone Boulevard Extension Feasibility Study.

Note: Project planning studies, right of way acquisition and construction for these projects are not yet planned.

Noise Information

Any time there is a change in surroundings, noise changes. A new or expanded road will change the noise level due to increased traffic. NCDOT seeks to reduce predicted noise increases for nearby residents. 

On Feb. 29, 2016, NCDOT held a public meeting to discuss proposed noise walls between Battleground Avenue and Lawndale Drive. The following maps and slides were presented:

Corridor Protection Information

Property that will be needed in the future to build the Greensboro Urban Loop has been placed in what is called a "Protected Corridor."