Alternative B Maps

​​​​​​​​​​​​​These maps were updated Oct. 26, 2020, to include the results of the Traffic Noise Report completed in September 2020. The new maps show three areas where “reasonable and feasible noise abatement” is recommended for further investigation during the Design Noise Report, which will be completed during the design-build phase of the project. These areas are outlined on Maps 2, 3, and 5.​ ​